Stadium of the Algarve – Faro
Rated power: 250 kW
Peak power: 276 kW
Estimated production: 518,127 kWh / year
Consumption equivalent: 161 dwellings
Economy CO2: 508 Tm
Production area: 4.400 m2
Number of panels: 1024
I.D.F.G – Algarve – Faro
Rated power: 28 kW
Peak power: 31 kW
Estimated production: 58,030 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 82 Tm
Production area: 256 m2
Number of panels: 115
Stadium S. Luís – S.C. Farense
Rated power: 140 kW
Peak power: 154 kW
Estimated production: 290,151 kWh / year
Equivalent consumption: 90 dwellings
CO2 economy: 284 Tm
Production area: 1,240 m2
No. Panels: 596
Campolide Station- Lisbon
Rated power: 53 kW
Peak power: 59.5 kW
Estimated yield: 83,436 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 82 Tm
Production area: 395 m2
Number of panels: 238
CTC Campolide Building – Lisbon
Rated power: 20 kW
Peak power: 20.52 kW
Estimated production: 28,916 kWh / year
Equivalent consumption: 9 dwellings
CO2 economy: 28 Tm
Production area: 152 m2
Number of panels: 76
Football Club de Stª Iria- Loures
Rated power: 50 kW
Peak power: 55 kW
Estimated production: 94,468 kWh / year
Consumption equivalent: 30 dwellings
Economy CO2: 94 Tm
Production area: 350 m2
Number of panels: 208
Roma-Areeiro Station – Lisbon
Rated power: 30 kW
Peak power: 31.5 kW
Estimated production: 44,247 kWh / year
Consumption equivalent: 14 rooms
Economy CO2: 43 Tm
Production area: 210 m2
Number of panels: 126
Póvoa de Santa Iria Station – Loures
Rated power: 40 kW
Peak power: 43 kW
Estimated production: 59,986 kWh / year
Consumption equivalent: 18 dwellings
CO2 economy: 58 Tm
Production area: 285 m2
Number of panels: 172
Santa Apolonia Station – Lisbon
Rated power: 60 kW
Peak power: 63 kW
Estimated yield: 85,864 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 83 Tm
Production area: 418 m2
Nº Panels: 252
Riachos Kindergarten
Rated power: 10 kW
Peak power: 11.5 kW
Estimated yield: 18,716 kWh / year
Consumption equivalent: 6 dwellings
CO2 economy: 18 Tm
Production area: 98 m2
Number of panels: 41
Library of the CM of Torres Novas
Rated power: 20 kW
Peak power: 21.12 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 212 m2
Number of panels: 88
Auditorium da CM de Torres Novas
Rated power: 20 kW
Peak power: 21.12 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 212 m2
Number of panels: 88
CE of Serra D’Aire of the CM of Torres Novas
Rated power: 20 kW
Peak power: 21.12 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 212 m2
Number of panels: 88
Sports Pavilion – CM Entroncamento
Rated power: 50 kW
Peak power: 55 kW
Estimated production: 93,528 kWh / year
Consumption equivalent: 29 dwellings
Economy CO2: 92 Tm
Production area: 440 m2
Nº Panels: 275
Technical School – CM Idanha-a-Nova
Rated power: 30 kW
Peak power: 33 kW
Estimated production: 57,245 kWh / year
Consumption equivalent: 18 dwellings
Economy CO2: 56 Tm
Production area: 350 m2
Number of panels: 165
Pools – CM Entroncamento
Rated power: 20 kW
Peak power: 22 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 440 m2
Number of panels: 220