Stadium of the Algarve – Faro
Stadium of the Algarve – Faro

Rated power: 250 kW
Peak power: 276 kW
Estimated production: 518,127 kWh / year
Consumption equivalent: 161 dwellings
Economy CO2: 508 Tm
Production area: 4.400 m2
Number of panels: 1024

I.D.F.G – Algarve – Faro
I.D.F.G – Algarve – Faro

Rated power: 28 kW
Peak power: 31 kW
Estimated production: 58,030 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 82 Tm
Production area: 256 m2
Number of panels: 115

Stadium S. Luís – S.C. Farense
Stadium S. Luís – S.C. Farense

Rated power: 140 kW
Peak power: 154 kW
Estimated production: 290,151 kWh / year
Equivalent consumption: 90 dwellings
CO2 economy: 284 Tm
Production area: 1,240 m2
No. Panels: 596

Campolide Station- Lisbon
Campolide Station- Lisbon

Rated power: 53 kW
Peak power: 59.5 kW
Estimated yield: 83,436 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 82 Tm
Production area: 395 m2
Number of panels: 238

CTC Campolide Building – Lisbon
CTC Campolide Building – Lisbon

Rated power: 20 kW
Peak power: 20.52 kW
Estimated production: 28,916 kWh / year
Equivalent consumption: 9 dwellings
CO2 economy: 28 Tm
Production area: 152 m2
Number of panels: 76

Football Club de Stª Iria- Loures
Football Club de Stª Iria- Loures

Rated power: 50 kW
Peak power: 55 kW
Estimated production: 94,468 kWh / year
Consumption equivalent: 30 dwellings
Economy CO2: 94 Tm
Production area: 350 m2
Number of panels: 208

Roma-Areeiro Station – Lisbon
Roma-Areeiro Station – Lisbon

Rated power: 30 kW
Peak power: 31.5 kW
Estimated production: 44,247 kWh / year
Consumption equivalent: 14 rooms
Economy CO2: 43 Tm
Production area: 210 m2
Number of panels: 126

Póvoa de Santa Iria Station – Loures
Póvoa de Santa Iria Station – Loures

Rated power: 40 kW
Peak power: 43 kW
Estimated production: 59,986 kWh / year
Consumption equivalent: 18 dwellings
CO2 economy: 58 Tm
Production area: 285 m2
Number of panels: 172

Santa Apolonia Station – Lisbon
Santa Apolonia Station – Lisbon

Rated power: 60 kW
Peak power: 63 kW
Estimated yield: 85,864 kWh / year
Consumption equivalent: 26 dwellings
Economy CO2: 83 Tm
Production area: 418 m2
Nº Panels: 252

Riachos Kindergarten
Riachos Kindergarten

Rated power: 10 kW
Peak power: 11.5 kW
Estimated yield: 18,716 kWh / year
Consumption equivalent: 6 dwellings
CO2 economy: 18 Tm
Production area: 98 m2
Number of panels: 41

Library of the CM of Torres Novas
Library of the CM of Torres Novas

Rated power: 20 kW
Peak power: 21.12 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 212 m2
Number of panels: 88

Auditorium da CM de Torres Novas
Auditorium da CM de Torres Novas

Rated power: 20 kW
Peak power: 21.12 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 212 m2
Number of panels: 88

Sports Pavilion – CM Entroncamento
Sports Pavilion – CM Entroncamento

Rated power: 50 kW
Peak power: 55 kW
Estimated production: 93,528 kWh / year
Consumption equivalent: 29 dwellings
Economy CO2: 92 Tm
Production area: 440 m2
Nº Panels: 275

Technical School – CM Idanha-a-Nova
Technical School – CM Idanha-a-Nova

Rated power: 30 kW
Peak power: 33 kW
Estimated production: 57,245 kWh / year
Consumption equivalent: 18 dwellings
Economy CO2: 56 Tm
Production area: 350 m2
Number of panels: 165

Pools – CM Entroncamento
Pools – CM Entroncamento

Rated power: 20 kW
Peak power: 22 kW
Estimated production: 37,433 kWh / year
Consumption equivalent: 12 dwellings
Economy CO2: 37 Tm
Production area: 440 m2
Number of panels: 220